During 25 years of activity on the market, TERBUD has completed numerous projects for Polski Koncern Naftowy ORLEN S.A. ( the Polish Oil Company ORLEN S.A.). Selected main tasks are listed below:
• renovation, maintenance and modernisation services of apparatuses, fittings, pipelines and steel constructions during maintenance shutdowns, and technological production installations-welding, fitting and mechanical, thermal insulation, anti-corrosion and chemical-resistant works, scaffoldings assembly,
• construction of the installation METATEZA - comprehensive execution of the construction, mechanical, anti-corrosion and insulation works in the field of foundations, steel constructions, technological pipelines and disassembly works based on the technical documentation provided by the ordering party. Customer- Elektrobudowa,
• execution of the pipe loop containing combustion gases around the H200 column as part of the investment task No. 21005. Customer - Orlen Projekt S.A.,
• modernization of the DRW III installation - pipelines disassembly (about 120 tons), pipelines assembly (about 240 tonnes) as well as disassembly and assembly of devices (pumps, exchangers, etc.). Execution of insulation and marking works.- Customer-Mostostal Płock S.A.,
• delivery and construction of installations for the catalytic denitrification and dedusting of exhaust gases (DeNOx) from EC boilers at PKN ORLEN SA in the turn-key system.- Execution of projects and thermal insulation, anti-corrosion and scaffolding works, Boilers K-1 TO K-7, - Customer-Polimex Mostostal SA,
• corrosion and thermal insulation and scaffoldings assembly as part of repair works for the storage tanks: -1, Z-2, Z-13B, Z-15/ABC, Z-54, Z-69,Z-77, Z-81, Z-82, Z-98, Z-107. The oil preparation plant,
• maintenance and chemical protection of chemical apparatus and devices using modern composite materials BELZONA,
• prefabrication and assembly of steel constructions, corrosion protection, hall cladding with sandwich panels scaffolding assembly and disassembly as part of the investment concerning the construction of Installation of the Flue Gas Desulphurization (IOS). Customer - ORLEN PROJECT,
• PTA in Włocławek - Insulation works (chemical apparatus, fittings, exchangers, pipelines) and assembly and disassembly of scaffoldings and transmission system trestles,
• replacement of the heat insulation and thermal imaging tests on the steam pipelines 0.02MPa, 0.65MPa, 1.7MPa and 3.2MPa in the EPC formula. Stages: III and V,
• works in the mechanical industry related to piping and construction - supports, platforms on the Aroma Extraction installation in connection with the construction of several new valves with the intelligent PST positioner and measurements on F-501 and 1-H2 furnaces,
• numerous anti-corrosion and thermal insulation services in the area of Fuel Terminals located throughout the country,